Railway traffic on the Crimean Bridge has resumed, and it goes according to the schedule. A repair crew is working on site to manage the consequences of the subversive attack
The railway traffic on the Crimean Bridge has resumed, and it continues according to the schedule, a Rossa Primavera News Agency‘s correspondent reported on October 9 from a window of a passenger train.
The railway traffic now goes on one railway. On the other, the consequences of the explosion are still being repaired.
In spite of serious damage to the Crimean Bridge, railway traffic resumed as early as on Saturday, October 8.
A repair crew continues working on the bridge to fix the consequences of the ignition.
The photos show only part of the damage to the railway tracks.
Some of the blown-up tanker cars still remain on the railways of the bridge.
The road traffic has also resumed. A lane reversal is operating. By the evening of October 9, two traffic lanes were launched. However, a many-kilometer traffic jam our of Kerch remains near the Crimean Bridge.
On October 8, a truck was blown up on the Crimean Bridge destroying a section of the bridge. Both railway and road traffic was suspended, but it resumed in the evening of the same day.
Source: Rossa Primavera News Agency